Project Plan

 

Instructions:

This week’s assignment is to create a project plan using industry-standard software. 

In this assignment, you will be creating a Work Breakout Structure (WBS), GANTT Chart, and Network Diagram for your project using the software application you have chosen. Please include:

At Least 30 Activities, each with

  • Duration/Dates
  • Predecessors
  • Resources
  • A Critical Path
  • Include a copy of the source file from your application. In the case of Smartsheet, include detailed screenshots embedded in a Word file.

extra websites for software

 Basecamp – https://basecamp.com (tutorials at: https://basecamp.com/help/2/videos (Links to an external site.)) Freedcamp – https://freedcamp.com (tutorial at: https://youtu.be/6S0jb6CnnH0 (Links to an external site.)) Flow – https://www.getflow.com (tutorials at: https://www.getflow.com/support (Links to an external site.)) Wrike – https://www.wrike.com (tutorials at: https://help.wrike.com/hc/en-us/categories/201188625 (Links to an external site.))